SERVICES

Corbett Suspension Bridge, Colchestor, NY

A temporary support was needed to take the weight off the bridge bearings and U-bolts so they could be replaced. Each suspension cable was temporarily attached to a custom-fabricated apparatus that transferred the cable load to the piles.

  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
Project Name and Location:
Corbett Suspension Bridge, Colchestor NY
Project Date:
November 2006
Project Type:
Piles Specification:
4 piles, pre-tensioned to 15 tons were installed in a tieback application using D10 matrial 1.75" Round Corner Square (RCS) solid steel square shaft and terminated with a Triple Guy Adapter.
Soil & Embedment Depth:
Project Timeline: