SERVICES

Cold Spring Landing Town Houses, Cold Spring, NY

Provide support for porches and decks on 10 townhouses constructed on the waterfront in Cold Spring. A subsurface investigation was completed and found that the upper 10′ of strata consisted of coarse sand and gravel underlain by a 60′ silty clay layer. It was concluded that the upper 10′ of soil would support the light loads of the decks and porches. The job was completed using a Gehl Skid Steer and a Toro Dingo for confined areas. Each pile was encased with 12″ sonotube, backfilled to finished grade and filled with concrete.

  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
  • slider-image
Project Name and Location:
Deck and Porch Pile Installation, Cold Spring Landing, Cold Spring, NY
Project Date:
September 2006
Project Type:
New Construction
Piles Specification:
FSI installed (48) 10"x 12" helical piles connected to 6"x 6" pile caps. Piles were installed to 4 kips.
Soil & Embedment Depth:
The helical piles were installed to 7'.
Project Timeline:
2 Days